| Project Overview |
| Project Name: |
Palma del Río I |
| Country: |
Spain |
| Location: |
Palma del Río (Córdoba) |
| Owner(s): |
Acciona Energía
(100%)
|
| Technology: |
Parabolic trough |
| Turbine Capacity: |
Net: 50.0 MW
Gross: 50.0 MW |
| Status: |
Operational |
| Start Year: |
2011
|
Do you have more information, corrections, or comments?
Palma del Río I
This page provides information on Palma del Río I, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
| Status Date: |
March 18, 2013
|
Background
| Technology: |
Parabolic trough |
| Status: |
Operational |
| Country: |
Spain |
| City: |
Palma del Río |
| Region: |
Córdoba |
| Lat/Long Location: |
37°38′
42.0″
North,
5°15′
29.0″
West |
| Land Area: |
135 hectares |
| Solar Resource: |
2,291 kWh/m2/yr
|
| Electricity Generation: |
114,500 MWh/yr
(Estimated)
|
| Contact(s): |
Asun Padrós |
| Company: |
Acciona Energía |
| Break Ground: |
June 2009 |
| Start Production: |
July 2011 |
| Construction Job-Years: |
350 |
| Annual O&M Jobs: |
31 |
| PPA/Tariff Type: |
RD 661/2007 |
| PPA/Tariff Rate: |
27.0 Euro cents per kWh |
| PPA/Tariff Period: |
25 years
|
Participants
| Developer(s): |
Acciona Energía |
| Owner(s) (%): |
Acciona Energía
(100%)
|
| EPC Contractor: |
Acciona Energía |
| Operator(s): |
Acciona Energía |
Plant Configuration
Solar Field
| Solar-Field Aperture Area: |
372,240 |
| # of Solar Collector Assemblies (SCAs): |
792 |
| # of Loops: |
99 |
| # of SCAs per Loop: |
8 |
| SCA Aperture Area: |
470 m² |
| SCA Length: |
100 m |
| # of Modules per SCA: |
12 |
| SCA Manufacturer (Model): |
Acciona Solar Power
(SGNX-2)
|
| Heat-Transfer Fluid Type: |
Biphenyl/Diphenyl oxide |
| Solar-Field Outlet Temp: |
393°C |
Power Block
| Turbine Capacity (Gross): |
50.0 MW
|
| Turbine Capacity (Net): |
50.0 MW |
| Output Type: |
Steam Rankine |
| Cooling Method: |
Wet cooling |
Thermal Storage