SWIFT Wind Turbine Testing and Results
The SWIFT wind turbine. Text Version
As part of the National Renewable Energy Laboratory and U.S. Department of Energy (NREL/DOE) Independent Testing project, NREL is testing the SWIFT small wind turbine at the National Wind Technology Center (NWTC). The competitive grant was awarded to Cascade Engineering. The SWIFT is a 1-kilowatt (kW), five-bladed with outer ring, horizontal-axis upwind small wind turbine. The turbine's rotor diameter is 2 meters, and its hub height is 13.72 meters. The SWIFT uses a single-phase permanent-magnet generator rated at 1 kW grid connected through an inverter at 240 volts AC.
Testing Summary
Supporting data and explanations for data provided in this table will be provided in the final reports. Data presented are preliminary and subject to revision.
Cumulative Energy Production
| Activity | Status |
|---|---|
| Award of Grant | December 1, 2009 |
| Preparation for Installation | Foundation installed: July 22, 2010 Components received: September 20, 2010 Documentation received: February 27, 2009 |
| Turbine Installation | October 19, 2010 |
| Turbine Commissioning | Cascade commissioning: October 19-22, 2010; Readiness verification: November 4, 2010; Data acquisition system check: October 18, 2010 |
| Turbine O&M and Testing | |
| Safety and Function Test | Safety and Function Test Report for the SWIFT Wind Turbine |
| Power Performance Test | Under publications review |
Hrs of valid data (60 required) |
707 |
Bins completed (3.5-14 m/s required) |
0.5-23 |
| Acoustic Noise Test | Complete |
| Power Quality Test | Not applicable |
| Duration Test | Duration Test Report for the SWIFT Wind Turbine |
Months of operation (6 required) |
13 (217%) |
Hours of power production (2,500 required) |
2,732 (109%) |
Hours of power production in winds greater than 10.2 m/s (250 required) |
533 (213%) |
Hours of power production in winds greater than 15.3 m/s (25 required) |
112 (448%) |
kWh of production, cumulative |
1155 |
| Turbine Removed | June 27, 2012 |
| Post-test Inspection | July 24, 2012 |
| Final Documentation | Not started |
| Project Review Meeting | Not started |