MIDC/Data Quality Statements
Total Records: 20, displaying 1-20

R#SiteSerial NumberMeasurementStart DateStart TimeEnd DateEnd TimeData Quality Statement
1BMSGlobal UV-S-B-T12/28/201306:46:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
2BMSGlobal UV-S-B-T12/21/201307:00:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
3BMSGlobal UV-S-B-T03/02/201308:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
4BMSGlobal UV-S-B-T05/26/201206:15:0005/26/201207:12:00Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
5BMSGlobal UV-S-B-T11/12/201111:59:0011/12/201113:26:00Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC.
6BMSGlobal UV-S-B-T09/08/201105:56:0009/08/201109:19:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
7BMSGlobal UV-S-B-T06/14/201113:01:0006/14/201113:14:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
8BMSGlobal UV-S-B-T05/25/201105:19:0005/26/201112:16:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
9BMSGlobal UV-S-B-T05/17/201114:20:0005/17/201114:48:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
10BMSGlobal UV-S-B-T05/07/201105:18:0005/07/201111:45:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
11BMSGlobal UV-S-B-T04/15/201106:11:0004/15/201106:50:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
12BMSGlobal UV-S-B-T12/09/200910:52:0012/09/200914:22:00Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01.
13BMSGlobal UV-S-B-T11/15/200807:45:0011/15/200814:29:00Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam.
14BMSGlobal UV-S-B-T12/22/200708:41:0012/22/200711:24:00Due to a scheduled SRRL/Mesa Top power outage on 12/22/2007, the TSP-1, TSP-700, All Global UVA and UVB, and the TWC Photometer were without power, therefore data is either bad or bogus.
15BMS010538Global UV-S-B-T07/28/200607:00:0007/28/200615:30:00Instrument signal was bogus at various times throughout the day during working hours, due to patch panel/deck cabling/data logger connection troubleshooting.
16BMS010538Global UV-S-B-T07/27/200615:28:0007/28/200606:46:00The SRRL BMS UV-S-A-T and UV-S-B-T intruments were swapped at 15:28 MST for an over-night instrument test (cal factors were NOT swapped in logger).
17BMS010538Global UV-S-B-T05/25/200610:50:0005/25/200611:10:00Due to power shutdown for installation of new SRRL equipment lift, the following Global UV instruments were down: CUVA1, CUVB1, MS-210W, 501A, UVB-1, UV-S-A-T, UV-S-B-T. Data during this time is bogus or bad.
18BMS010538Global UV-S-B-T07/23/200505:33:0007/23/200517:22:00Due to a scheduled NREL power outage on 7/23/2005 at 5:33 MST, the following Global instruments were down: CUVA1, CUVB1, MS-210W, 501A, UVB-1, UV-S-A-T, UV-S-B-T, TSP-1. Data during this time is bogus.
19BMSGlobal UV-S-B-T08/22/200108:31:0011/14/200111:36:00The UV-S-B-T was removed from service due to moisture leak. It will be returned to Kipp & Zonen for repair and the resistor used for monitoring the detector temperature will be replaced.
20BMSGlobal UV-S-B-T08/04/200111:00:0008/22/200108:31:00The UV-S-B-T detector temperature is not correct due to the wrong resistor being installed at the factory. The detector is actually maintained at 25C.