| R# | Site | Serial Number | Measurement | Start Date | Start Time | End Date | End Time | Data Quality Statement |
| 1 | SRRL BMS | | Global TSP-700 | 03/02/2013 | 08:06:00 | 03/02/2013 | 18:24:00 | Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
| 2 | SRRL BMS | | Global TSP-700 | 05/26/2012 | 06:15:00 | 05/26/2012 | 07:12:00 | Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
| 3 | SRRL BMS | | Global TSP-700 | 11/12/2011 | 11:59:00 | 11/12/2011 | 13:26:00 | Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC. |
| 4 | SRRL BMS | | Global TSP-700 | 09/08/2011 | 05:56:00 | 09/08/2011 | 09:19:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
| 5 | SRRL BMS | | Global TSP-700 | 06/14/2011 | 13:01:00 | 06/14/2011 | 13:14:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 6 | SRRL BMS | | Global TSP-700 | 05/25/2011 | 05:19:00 | 05/26/2011 | 12:16:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 7 | SRRL BMS | | Global TSP-700 | 05/17/2011 | 14:20:00 | 05/17/2011 | 14:48:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 8 | SRRL BMS | | Global TSP-700 | 05/07/2011 | 05:18:00 | 05/07/2011 | 11:45:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 9 | SRRL BMS | 0212-2 | Global TSP-700 | 04/17/2011 | 12:00:00 | | | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. The instrument connections will be re-seated the next time a problem occurs. |
| 10 | SRRL BMS | | Global TSP-700 | 04/15/2011 | 06:11:00 | 04/15/2011 | 06:50:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 11 | SRRL BMS | 0212-2 | Global TSP-700 | 10/04/2010 | 13:00:00 | 10/06/2010 | 08:00:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. The connector at the J-box was re-seated. |
| 12 | SRRL BMS | 0212-2 | Global TSP-700 | 09/22/2010 | 12:00:00 | 10/04/2010 | 08:00:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. All screws in TSP-700 power supply box were retightened. |
| 13 | SRRL BMS | 0212-2 | Global TSP-700 | 08/11/2010 | 00:00:00 | 08/29/2010 | 19:00:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. Problem appears to have stopped on 8/29/2010. |
| 14 | SRRL BMS | 0212-2 | Global TSP-700 | 12/13/2009 | 00:00:00 | 12/17/2009 | 15:30:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. Some days there is no problem. (4) screws in the patch panel for this channel were retightened which seemed to fix the problem. |
| 15 | SRRL BMS | 0212-2 | Global TSP-700 | 12/09/2009 | 10:52:00 | 12/09/2009 | 14:22:00 | Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01. |
| 16 | SRRL BMS | 0212-2 | Global TSP-700 | 07/14/2009 | 00:00:00 | 11/11/2009 | 12:30:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. Some days there is no problem. Several screws in the power supply box were retightened which seemed to fix the problem. |
| 17 | SRRL BMS | 0212-2 | Global TSP-700 | 11/15/2008 | 07:45:00 | 11/15/2008 | 14:29:00 | Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam. |
| 18 | SRRL BMS | 0212-2 | Global TSP-700 | 09/26/2008 | 00:00:00 | 03/04/2009 | 14:00:00 | There is an occasional drastic noise problem with the SRRL BMS TSP-700, which started showing up 9/26/2008. Every screw between the data logger and instrument was retightened, this includes the patch panel and power supply box, which seemed to solve the problem. |
| 19 | SRRL BMS | 0212-2 | Global TSP-700 | 05/29/2008 | 00:00:00 | 06/09/2008 | 13:00:00 | The signal from the TSP-700 would occasionally drop low during this time frame. A screw was tightened in the power supply box, which seemed to fix the problem. |
| 20 | SRRL BMS | 0212-2 | Global TSP-700 | 12/22/2007 | 08:41:00 | 12/22/2007 | 11:24:00 | Due to a scheduled SRRL/Mesa Top power outage on 12/22/2007, the TSP-1, TSP-700, All Global UVA and UVB, and the TWC Photometer were without power, therefore data is either bad or bogus. |
| 21 | SRRL BMS | 0212-2 | Global TSP-700 | 05/25/2006 | 10:50:00 | 05/25/2006 | 11:10:00 | Data from the Yankee instrument is bad or bogus due to power shutdown for installation of new SRRL equipment lift. |
| 22 | SRRL BMS | 0212-2 | Global TSP-700 | 11/18/2005 | 08:20:00 | 11/18/2005 | 12:06:00 | The SRRL BMS Yankee TSP-700 was down for power supply upgrade. The old Condor HAA15-0.8-A+ (+/-12 V @ 1 Amp) was replaced with a new Condor HB12-1.7-A+ (+12 V @ 1.7 Amp). The new higher current power supply can now restart the TSP-700 after a power failure. Note: The -12 V output on the old power supply was not needed (Yankee had designed it as a universal power supply for all their instruments). |
| 23 | SRRL BMS | 0212-2 | Global TSP-700 | 11/04/2005 | 23:14:00 | 11/09/2005 | 08:42:00 | The SRRL BMS Yankee TSP-700 has been down due to a design flaw or fault with the Yankee power supply, caused by a power outage on 11/4/2005 at 23:14 MST. The power supply is unable to power up both the ventilator and the heater simultaneously (even though it was designed to). Data during this time is bogus. |
| 24 | SRRL BMS | 0212-2 | Global TSP-700 | 07/23/2005 | 05:33:00 | 07/25/2005 | 07:18:00 | The SRRL BMS Yankee TSP-700 has been down due to a design flaw or fault with the Yankee power supply, caused by a scheduled NREL power outage on 7/23/2005 at 5:33 MST. The power supply is unable to power up both the ventilator and the heater simultaneously (even though it was designed to). Data during this time is bogus. |
| 25 | SRRL BMS | 0212-2 | Global TSP-700 | 02/16/2005 | 09:02:00 | 02/17/2005 | 08:51:00 | The SRRL BMS Yankee TSP-700 has been down due to a design flaw or fault with the Yankee power supply, caused by a scheduled SRRL power outage on 2/16/2005 at 9:02 MST. The power supply is unable to power up both the ventilator and the heater simultaneously (even though it was designed to). Data during this time is bogus. |