| R# | Site | Serial Number | Measurement | Start Date | Start Time | End Date | End Time | Data Quality Statement |
| 1 | SRRL BMS | | Direct CUVA2 | 03/02/2013 | 13:06:00 | 03/02/2013 | 18:24:00 | Due to a scheduled NREL power outage, to upgrade campus power capacity, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4. The Sci-Tec tracker for these insruments are protected by UPS, however the battery depleted at 13:06 MST (the power outage started at 8:06 MST) |
| 2 | SRRL BMS | | Direct CUVA2 | 03/02/2013 | 08:06:00 | 03/02/2013 | 18:24:00 | Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
| 3 | SRRL BMS | | Direct CUVA2 | 07/06/2012 | 19:35:00 | 07/09/2012 | 10:18:00 | A GFCI on the North tracker post was tripped due to thunderstorms. Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
| 4 | SRRL BMS | | Direct CUVA2 | 05/26/2012 | 06:15:00 | 05/26/2012 | 07:12:00 | Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
| 5 | SRRL BMS | | Direct CUVA2 | 11/12/2011 | 11:59:00 | 11/12/2011 | 13:26:00 | Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC. |
| 6 | SRRL BMS | | Direct CUVA2 | 09/08/2011 | 05:56:00 | 09/08/2011 | 09:19:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
| 7 | SRRL BMS | | Direct CUVA2 | 07/12/2011 | 22:57:00 | 07/13/2011 | 07:40:00 | Due to a tripped GFCI outlet at SRRL the following instruments were without power during this time: TWC & POM-01 Photometers, Direct CUVA2 & CUVB2, and the PGS100. The readings are either zero or bogus and should not be used. GFCI was tripped due to Eppley venitlators which were water logged by thunderstorm. |
| 8 | SRRL BMS | | Direct CUVA2 | 06/14/2011 | 13:01:00 | 06/14/2011 | 13:14:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 9 | SRRL BMS | | Direct CUVA2 | 05/25/2011 | 05:19:00 | 05/26/2011 | 12:16:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 10 | SRRL BMS | | Direct CUVA2 | 05/17/2011 | 14:20:00 | 05/17/2011 | 14:48:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 11 | SRRL BMS | | Direct CUVA2 | 05/07/2011 | 05:55:00 | 05/09/2011 | 07:58:00 | There was a planned power outage for SRRL construction activities that started at 5:18 MST. Unfortunately, the backup generator provided to SRRL was providing bad power to the UPS powering the Sci-Tec trackers, therefore the UPS failed at 5:55 MST. Unfortunately, when normal AC power was restored at 11:45 MST, the Sci-Tec trackers had lost all their configuration due to UPS cycling on and off during the outage, therefore were not tracking. The tracker settings were restored on May 9 at 7:58 MST. The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4 |
| 12 | SRRL BMS | | Direct CUVA2 | 05/07/2011 | 05:18:00 | 05/07/2011 | 11:45:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 13 | SRRL BMS | | Direct CUVA2 | 04/15/2011 | 06:11:00 | 04/15/2011 | 06:50:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 14 | SRRL BMS | | Direct CUVA2 | 07/04/2010 | 18:10:00 | 07/06/2010 | 07:30:00 | Due to several tripped GFCI outlets at SRRL the following instruments were without power from July 4 @ 18:10 to July 6 @ 7:30 MST: Global CUVA1, CUVB1, MS210W, 501A and Direct CUVA2, CUVB2, PGS100. The readings are either zero or bogus and should not be used. |
| 15 | SRRL BMS | 961003 | Direct CUVA2 | 06/11/2010 | 14:38:00 | 06/14/2010 | 08:01:00 | The Kipp & Zonen Direct CUVA2 and CUVB2 were without power during this time, most likely due to tripped GFI caused by hail storm. Measured signal is bogus. |
| 16 | SRRL BMS | | Direct CUVA2 | 05/27/2010 | 18:00:00 | 05/28/2010 | 12:15:00 | Due to improper mounting of the replacement CH1 s/n 080033 the Sci-tec tracker was not tracking properly due to collision with the CH1 against tracker. The following BMS instruments were not pointing at the sun: Direct CH1, NIP2, CUVA2, & CUVB2 and the following instruments were unshaded: 8-48, PSP, PIR. |
| 17 | SRRL BMS | | Direct CUVA2 | 12/09/2009 | 10:52:00 | 12/09/2009 | 14:22:00 | Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01. |
| 18 | SRRL BMS | | Direct CUVA2 | 11/15/2008 | 07:45:00 | 11/15/2008 | 14:29:00 | Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam. |
| 19 | SRRL BMS | 961003 | Direct CUVA2 | 06/28/2006 | 13:04:00 | 07/17/2006 | 11:06:00 | The Kipp & Zonen Direct UVA was mistakenly disconnected at the Junction Box. Measured signal is bogus. |
| 20 | SRRL BMS | 961003 | Direct CUVA2 | 01/05/2006 | 11:26:00 | 06/28/2006 | 13:04:00 | The Kipp & Zonen Direct UVA has been removed from service for troubleshooting low unstable output. Unit was sent back to the factory for repair and returned to service on June 28. The unit still needs calibration (assuming that it's functioning correctly). |
| 21 | SRRL BMS | 961003 | Direct CUVA2 | 12/13/2005 | 13:31:00 | 01/05/2006 | 11:25:00 | The Kipp & Zonen Direct UVA was repaired at the factory and returned to service. However, there is still a problem with the instrument. It is reading 100 times low. Factory will get back to us on whether this is "normal" after such a repair. New cal factor of -8.617 W/m^2/mV (102.78 times larger based on comparison with Direct TUVR on 12/14/2005) was entered into logger on 12/29/2005, however unit is still reading about 30-40% low, unit may be unstable. No word from factory. |
| 22 | SRRL BMS | 961003 | Direct CUVA2 | 05/22/2005 | 08:24:00 | 12/13/2005 | 13:30:00 | The Kipp & Zonen Direct UVA instrument has failed. The temperature controller works fine (it was verified with the CUVB2 instrument). The sensor output would not go over 0.1 W/m^2. Instrument will be returned to factory and channel was shorted on June 6 @ 08:34 MST to read zero. |