1BMSGlobal MS-210W12/28/201306:46:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
2BMSGlobal MS-210W12/21/201307:00:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
3BMSGlobal MS-210W09/13/201316:08:0009/14/201309:55:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
4BMSGlobal MS-210W07/13/201316:23:0007/14/201308:29:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
5BMSGlobal MS-210W03/02/201308:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
6BMSGlobal MS-210W07/31/201212:28:0008/01/201206:18:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
7BMSGlobal MS-210W07/06/201219:35:0007/09/201210:18:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
8BMSGlobal MS-210W05/26/201206:15:0005/26/201207:12:00Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
9BMSGlobal MS-210W11/12/201111:59:0011/12/201113:26:00Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC.
10BMSGlobal MS-210W09/08/201105:56:0009/08/201109:19:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
11BMSGlobal MS-210W07/07/201116:45:0007/08/201112:46:00A GFI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
12BMSGlobal MS-210W06/20/201100:10:0006/21/201105:09:00A GFI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
13BMSGlobal MS-210W06/14/201113:01:0006/14/201113:14:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
14BMSGlobal MS-210W05/25/201105:19:0005/26/201112:16:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
15BMSGlobal MS-210W05/17/201114:20:0005/17/201114:48:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
16BMSGlobal MS-210W05/07/201105:18:0005/07/201111:45:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
17BMSGlobal MS-210W04/15/201106:11:0004/15/201106:50:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
18BMSGlobal MS-210W07/04/201018:10:0007/06/201007:30:00Due to several tripped GFCI outlets at SRRL the following instruments were without power from July 4 @ 18:10 to July 6 @ 7:30 MST: Global CUVA1, CUVB1, MS210W, 501A and Direct CUVA2, CUVB2, PGS100. The readings are either zero or bogus and should not be used.
19BMSGlobal MS-210W05/06/201015:55:0005/07/201006:30:00The connector at the instrument filled with water during this time and the instrument was reading negative or very low. The o-ring in the connector was missing, a new one was installed at 8:45 MST on May 7.
20BMSGlobal MS-210W04/21/201021:27:0004/22/201012:18:00The connector at the instrument filled with water during this time and the instrument was reading negative or very low.
21BMSGlobal MS-210W12/09/200910:52:0012/09/200914:22:00Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS-210W, SPN1, Snow Depth, TSI-880, POM-01.
22BMSGlobal MS-210W11/15/200807:45:0011/15/200814:29:00Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam.
23BMSGlobal MS-210W12/22/200708:41:0012/22/200711:24:00Due to a scheduled SRRL/Mesa Top power outage on 12/22/2007, the TSP-1, TSP-700, All Global UVA and UVB, and the TWC Photometer were without power, therefore data is either bad or bogus.
24BMSS92096.04Global MS-210W05/25/200610:50:0005/25/200611:10:00Due to power shutdown for installation of new SRRL equipment lift, the following Global UV instruments were down: CUVA1, CUVB1, MS-210W, 501A, UVB-1, UV-S-A-T, UV-S-B-T. Data during this time is bogus or bad.
25BMSS92096.04Global MS-210W07/23/200505:33:0007/23/200517:22:00Due to a scheduled NREL power outage on 7/23/2005 at 5:33 MST, the following Global instruments were down: CUVA1, CUVB1, MS-210W, 501A, UVB-1, UV-S-A-T, UV-S-B-T, TSP-1. Data during this time is bogus.