| Project Overview |
| Project Name: |
Lebrija 1
(LE-1)
|
| Country: |
Spain |
| Location: |
Lebrija (Sevilla) |
| Owner(s): |
Solel Solar Systems, LTD.
(50%)
Valoriza Energía, S.L.
(50%)
|
| Technology: |
Parabolic trough |
| Turbine Capacity: |
Gross: 49.9 MW |
| Status: |
Under construction |
| Start Year: |
2010
|
Do you have more information, corrections, or comments?
Lebrija 1
This page provides information on Lebrija 1, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
| Status Date: |
April 14, 2009
|
Background
| Technology: |
Parabolic trough |
| Status: |
Under construction |
| Country: |
Spain |
| City: |
Lebrija |
| Region: |
Sevilla |
| Lat/Long Location: |
37°0′
10.8″
North,
6°2′
52.0″
West |
| Land Area: |
188 hectares |
| Solar Resource: |
1,993 kWh/m2/yr
|
| Electricity Generation: |
120,000 MWh/yr
(Expected/Planned)
|
| Contact(s): |
Carlos Cachadiña; José Ramón Colomina |
| Company: |
Soleval |
| Break Ground: |
November 2008 |
| Start Production: |
May 2010 |
| Construction Job-Years: |
500 |
| PPA/Tariff Rate: |
27.0 Euro cents per kWh |
| PPA/Tariff Period: |
25 years
|
Participants
| Developer(s): |
Solucia Renovables 1, S.L. |
| Owner(s) (%): |
Solel Solar Systems, LTD.
(50%)
Valoriza Energía, S.L.
(50%)
|
| EPC Contractor: |
Soleval Renovables, S.L. |
| Operator(s): |
Soleval Renovables, S.L. |
Plant Configuration
Solar Field
| Solar-Field Aperture Area: |
412,020 m² |
| # of Solar Collector Assemblies (SCAs): |
756 |
| SCA Aperture Area: |
545 m² |
| SCA Length: |
95 m |
| SCA Manufacturer: |
Solel |
| Mirror Manufacturer: |
Solel |
| # of Heat Collector Elements (HCEs): |
18,144 |
|
HCE Manufacturer: |
Solel |
| Heat-Transfer Fluid Type: |
Therminol VP1 |
| Solar-Field Outlet Temp: |
395°C |
Power Block
| Turbine Capacity (Gross): |
49.9 MW
|
| Output Type: |
Rankine |
| Power Cycle Pressure: |
100.0 bar |
| Cooling Method: |
Wet cooling |
| Turbine Efficiency: |
38.7% @ full load
|
| Fossil Backup Type: |
HTF heater |
| Backup Percentage: |
12%
|